Heating control panel project for local Health Centre ‘Doclands’ in Preston. This new build required a BMS control panel to be designed, built and commissioned in two weeks, in a plant room with limited space available.

The project was completed successfully in the strict time frame provided and difficult ‘tight’ installation conditions and now provides monitored heat to the building with easy access to the Gas and Water meter readings from the control panel.  As standard a Gas safety E-stop interlock was installed to ensure the panel was up to building regulations.