Snowdonia Cheese Company Phase Two (Rhyll)

Melting schedule for dual silo arrangement for the protective wax layer. Real time smart phone alarm notifications installed to minimise manufacturing down time. The customer was particularly interested in having a user interface that they felt comfortable monitoring production with. They were very happy with the outcome.

Bedford College – Energy Centre

Interesting Project at Bedford College Energy Centre, retrofitting an existing Trend control panel that the customer had no confidence in. New controls for a river heat recovery system from the river Ouse will utilise two water source heat pumps to maintain the Colleges heating with an existing back up Boiler to support the heating demands […]

Green Lane Primary School (Bradford)

Entire plant room upgrade at a large primary school in Bradford for a new customer; Connaught Facilities. A few unexpected challenges along the way but in the end a project we were all really proud to be a part of. Standard school set up including Gas interlock, Fire Alarm interface, CO2 detection,  Time clock and […]

St Mary’s Health Centre, Penwortham

electrical solutions for the NHS

CUSTOMER / St Mary’s Health Centre, Penwortham TECHNOLOGY / Priva Blue ID with Touchpoint display OUTCOMES / 22% saving on gas bills, reduced maintenance, user-friendly front end OVERVIEW St Mary’s Health Centre in Penwortham near Preston has reduced its gas consumption by an impressive 52,000 kWh per annum as a result of replacing its existing […]

What makes us unique?

Eco Electrical and Building Services Ltd has a few different sectors but is predominately an electrical contracting company. What makes us unique is over the last 20 years our engineers have specialised in the horticultural industry due to our location and our customer base. We have a UK Priva Horticulture dealership which means we have […]