Doclands Preston

We are delighted to share details of our recent heating control panel project at the local Health Centre, ‘Doclands’, in Preston. This new build presented us with the challenge of designing, constructing, and commissioning a BMS control panel within a tight two-week timeframe, all while working in a plant room with limited available space.

Despite the demanding installation conditions, our team successfully completed the project within the specified timeline. The newly installed control panel now efficiently monitors and regulates heat distribution throughout the building. Furthermore, it provides convenient access to gas and water meter readings directly from the control panel, facilitating accurate monitoring of utility usage.

To ensure compliance with building regulations, we incorporated a gas safety E-stop interlock as a standard feature in the control panel. This safety measure enhances the overall system integrity, providing peace of mind and adhering to the highest standards of safety.

We are proud to have delivered this project on schedule, overcoming challenging installation constraints and delivering a reliable heating control solution for the Doclands Health Centre. Our commitment to quality, efficiency, and compliance remains at the forefront of our operations, ensuring optimal performance and safety for our valued clients.